Skip to main content
📍 Agra, UP

Rooftop Solar in Agra

Professional rooftop solar — survey, supply, install, subsidy, and net metering handled end to end.

Rooftop solar is the fastest way for homes and businesses in Agra to reduce electricity bills. We design, supply, and install complete rooftop solar systems in Agra using India's most trusted brands — with full DISCOM coordination and subsidy support.
  • PM Surya Ghar subsidy — up to ₹1,08,000
  • UPPCL net metering handled for you
  • 540+ completed installs in UP
Rooftop solar installation in Agra by Ensolvar

Trusted Partner of the Most Prominent Brands

Tata Solar
Adani Solar
Waaree
UTL Solar
Luminous
Deye
Havells
Growatt
Sungrow
Microtek
Tata Solar
Adani Solar
Waaree
UTL Solar
Luminous
Deye
Havells
Growatt
Sungrow
Microtek
Local Solar Potential

Why Agra is Perfect for Solar

Seeing steady adoption among residential and commercial properties.

180+ Systems

Already installed locally

Annual Sunshine

~291Days/Year

Massive potential for maximum generation and higher ROI in Agra.

Electricity Board

PVVNL (Pashchimanchal Vidyut Vitran Nigam Limited)

Est. Electricity Rate

₹6.00 - ₹7.00 / unit

Solar Potential

4.5 to 5.0 peak sun hours/day

Avg. System Size

3kW to 5kW

Areas Served in Agra

Kamla NagarSikandraTajganjDayal Bagh

Benefits

Why customers choose Ensolvar for this service.

Reduce electricity bills by 70–90%

A rooftop solar system in UP can cut your monthly electricity bill by 70–90%, with payback periods of 4–6 years depending on system size and usage.

PM Surya Ghar subsidy up to ₹1,08,000

Eligible residential homes in UP can receive a central government subsidy of up to ₹1,08,000 under PM Surya Ghar Muft Bijli Yojana — reducing upfront cost significantly.

25-year solar panel performance warranty

Branded solar panels from Tata, Adani, Waaree, UTL and 10+ other prominent brands carry 25-year linear performance warranties — ensuring reliable, consistent power generation for decades.

Net metering with UPPCL

Export surplus solar electricity to the UPPCL grid via net metering and earn credits on your bill — making your system work even when your consumption is lower.

Clean, professional installation

Our installations follow electrical safety standards with neat cabling, proper earthing, surge protection, and a clean commissioning handover.

Covers all project types

Residential homes, commercial shops, schools, hospitals, factories, and industrial units — we design and install the right system for every project type across UP.

Use cases

Ideal applications for this solar solution.

01

Residential homes

2kW to 10kW on-grid solar systems for houses in UP with PM Surya Ghar subsidy support and net metering with UPPCL.

02

Shops and commercial buildings

3kW to 50kW solar systems for shops, offices, petrol pumps, hotels, and commercial complexes across Uttar Pradesh.

03

Schools and colleges

Solar for educational institutions reduces recurring electricity costs and supports a clean energy curriculum with real-world installation examples.

04

Factories and industrial units

Large-scale industrial solar from 25kW to several MW for factories, cold storage, and manufacturing units with HT/LT connection support.

05

Hospitals and healthcare

Reliable solar for hospitals and clinics with battery backup options for critical load protection and uninterrupted power supply.

06

Agriculture and irrigation pumps

Solar pump systems for farmers across UP — reducing diesel costs and qualifying for PM KUSUM solar pump scheme support.

Local Context: Agra

Home to the Taj Mahal and one of India's most visited tourist destinations, Agra sits on the Yamuna River in Western UP with a population of over 1.8 million. The Yamuna plains trap radiant summer heat, pushing peak temperatures to 46°C and driving residential electricity bills to ₹2,500–₹3,500 per month from May through July. The city's mix of heritage tourism, residential colonies, and small-scale industry supports a growing mixed solar market with strong interest in both on-grid and off-grid solutions.

Peak Summer

46°C

temperature

Summer Bill

₹2,500–₹3,500

avg per month

Winter Bill

₹800–₹1,500

avg per month

Solar Market

Mixed (on-grid & off-grid)

local profile

Everything You Need To Know

Find answers about installation, AMC, brands, and project execution with Ensolvar.

Have a question?

Can't find the answer you're looking for? Our solar experts are here to help you 24/7.

Contact Us
Q: How much does a 3kW solar system cost in Uttar Pradesh?
A complete 3kW on-grid solar system in UP costs approximately ₹1,70,000 to ₹2,10,000 including panels, inverter, mounting, wiring, and installation. After PM Surya Ghar subsidy (₹78,000 for up to 2kW or ₹1,08,000 for above 2kW), the effective cost is significantly lower for eligible homes.
Q: How long does rooftop solar installation take in UP?
A typical residential solar installation in UP takes 2–4 days for physical installation and commissioning, plus 15–30 additional days for DISCOM net metering approval and subsidy processing. We handle all paperwork and UPPCL coordination.
Q: Am I eligible for PM Surya Ghar subsidy?
Residential homeowners in UP with a domestic DISCOM electricity connection are eligible. The subsidy is ₹78,000 for 1–2kW systems and ₹1,08,000 for 2kW and above. You must install the system through an empanelled vendor and apply through the PM Surya Ghar portal. Ensolvar guides the full process.
Q: Does Ensolvar install solar near Kamla Nagar, Agra?
Yes, we have a strong presence in Agra and serve all major areas including Kamla Nagar and nearby localities. Our local technical team can visit your site within 24-48 hours.
Q: How long does net metering approval take with PVVNL in Agra?
Net metering approvals with PVVNL in Agra typically take between 2 to 4 weeks depending on the local division office's processing time. Ensolvar handles the entire documentation and liaison process so you don't have to visit the electricity department yourself.
Q: Are there subsidies available for commercial solar projects in Agra?
While residential rooftop systems are eligible for PM Surya Ghar subsidies, commercial properties (like factories, hospitals, or large offices) in Agra do not qualify for direct capital subsidies. However, businesses can benefit heavily from Accelerated Depreciation (AD) benefits under the Income Tax Act, which significantly reduces the ROI period.

Claim Your PM Surya Ghar Subsidy Today

Don't wait! Share your location and electricity bill, and our experts will instantly calculate your exact subsidy amount and installation cost.