Survey-first approach: roof assessment and usage analysis before sizing
Solar Installation Across Uttar Pradesh — Done Right
From site survey to final commissioning, Ensolvar handles every step of your rooftop solar installation — using Tata, Adani, Waaree, Luminous, and UTL equipment — with PM Surya Ghar subsidy and net metering support.
- Site survey, shading analysis, and system sizing before any quote
- Tata, Adani, Waaree, Luminous, or UTL solar — your choice of brand
- PM Surya Ghar subsidy up to ₹1,08,000 for eligible homes
- UPPCL net metering coordination handled for you
- Clean installation with earthing, surge protection, and commissioning
✦ Free site survey · No upfront cost · Response within 24–48 hrs
What this looks like in practice
A solar installation is a 25-year investment. We focus on doing it correctly — right system size, right brand, safe wiring, and a commissioning process that leaves no loose ends.
Talk to a solar expertBrand-matched system design: right inverter for your chosen panel brand
Full subsidy support: PM Surya Ghar portal, DISCOM coordination, disbursement follow-up
Net metering setup: bidirectional meter application and UPPCL inspection
Post-installation documentation: test certificates, warranty cards, and operation guide
What this service includes
The goal is a complete, subsidy-supported solar system that is safe, well-installed, and connected to the grid — ready to save from day one.
Site survey and shading analysis
We assess your roof orientation, structural capacity, shading from trees/buildings, and electricity usage before proposing a system.
System design and brand selection
We recommend the optimal system size (kW), panel brand, inverter model, and mounting type based on your roof and goals.
Supply of panels, inverter, and balance of system
We source genuine Tata, Adani, Waaree, Luminous, or UTL equipment with valid warranty from authorised supply chains.
Professional installation with safety compliance
Installation with neat cable management, proper earthing, DC and AC protection devices, and structural mounts certified for wind load.
PM Surya Ghar subsidy application
We register your system on the PM Surya Ghar portal, submit post-installation inspection documents, and track subsidy disbursement.
UPPCL net metering coordination
We apply for net metering, coordinate the DISCOM technical inspection, and ensure your bidirectional meter is installed.
Commissioning and handover
Final system testing, performance confirmation, and a complete handover package — warranty cards, test report, and operating guide.
A clear process from enquiry to execution
- 01
Share your details
Tell us your location, property type, monthly electricity bill, and roof space. We start with your site, not a generic package.
- 02
Receive a full proposal
We provide system size, brand options, complete pricing, subsidy estimate, and ROI calculation — within 24–48 hours.
- 03
Installation and testing
Our team completes installation within 2–4 days, with earthing, protection, and performance testing before we hand over.
- 04
Subsidy, metering, and handover
We manage PM Surya Ghar subsidy submission and UPPCL net metering coordination so you can start earning solar credits.
✦ The goal is a complete, subsidy-supported solar system that is safe, well-installed, and connected to the grid — ready to save from day one.
हमारे सहयोगी ब्रांड
Our Collaborating Brands — Tata · Adani · Waaree · UTL · Luminous
Tata Solar
25-yr warranty · ALMM listed
Adani Solar
Govt-grade · Mono-PERC
Waaree
30-yr warranty · 400–550 Wp
UTL Solar
Off-grid & hybrid systems
Luminous
India's #1 solar inverter
Questions customers usually ask
Q: What does Ensolvar's solar installation service include?
Our installation service covers the complete project — site survey and shading analysis, system sizing, structural load check, branded panel and inverter supply, safe electrical installation with earthing and surge protection, net metering application, DISCOM coordination, and final commissioning with handover documentation.
Q: Which property types do you install solar for in UP?
We install solar systems for all property types in Uttar Pradesh — residential homes (2kW–10kW), shops and commercial offices (3kW–50kW), educational institutions, hospitals, and large industrial and manufacturing facilities (50kW and above).
Q: Which solar brands do you install?
We install Tata, Adani, and Waaree solar panels paired with inverters from Luminous, Solis, and Growatt. Brand selection is guided by your budget, roof space, system type, and PM Surya Ghar subsidy eligibility requirements.
Q: Do you help with PM Surya Ghar subsidy in UP?
Yes. We handle the full PM Surya Ghar subsidy process for residential customers — from pre-registration on the national portal, DISCOM empanelment check, post-installation inspection coordination, and subsidy disbursement follow-up with UPPCL.
Q: How long does solar installation take?
Physical installation is completed in 2–4 working days. Net metering approval from UPPCL takes 15–30 days. PM Surya Ghar subsidy credit takes an additional 30–60 days after commissioning. We manage all post-installation paperwork.
Explore the other service paths
Solar AMC
Regular maintenance prevents the 20–30% power loss that dust and minor faults cause over time. Our solar AMC plans keep your system clean, checked, and performing at full output.
View ServiceSolar Products
Genuine solar panels, inverters, and batteries from India's most trusted brands — supplied and installed across all UP districts by Ensolvar.
View ServiceSolar Installation · Ensolvar
Plan your solar installation in UP
Share your location, roof details, and electricity usage. We'll provide a complete installation plan with subsidy estimate and brand options.
✦ Free site survey · No obligation · Response within 24–48 hrs